Sound Added to Your Favorites Soundboard
Log in or create an account to save your favorites, or they'll expire in 12 hours
Error Adding Sound
Error adding sound to your favorites.
Sound Reported
Sound reported and our moderators will review it shortly.
Error Reporting Sound
Error reporting sound. Please use the Contact page.
Title | I'm pretty sure that was in the change order. |
From | Halloween Ends |
Type | MP3 |
Duration | 2 seconds |
Plays | 0 plays |
Auto Transcribed | No |
Download | |
More | |
Aural Matches | |
Share |
This sound clip is from:
Title: Halloween Ends: The Terrifying Conclusion (2022)
Cast:
- Jamie Lee Curtis as Laurie Strode
- Judy Greer as Karen Nelson
- Andy Matichak as Allyson Nelson
- Nick Castle as Michael Myers
- Anthony Michael Hall as Tommy Doyle
- Kyle Richards as Lindsey Wallace
- Charles Cyphers as Sheriff Leigh Brackett
- Nancy Stephens as Marion Chambers
- Robert Longstreet as Lonnie Elam
- Dylan Arnold as Cameron Elam
- James Jude Courtney as The Shape
Halloween Ends is a bone-chilling horror film, released in 2022, that serves as the thrilling culmination of an iconic slasher series. Directed by David Gordon Green, this movie brings a climactic end to the battle between Laurie Strode (Jamie Lee Curtis) and the relentless killer, Michael Myers (Nick Castle and James Jude Courtney).
Picking up from the previous installment, Halloween Kills, Halloween Ends sends shockwaves through the audience as Laurie and her family desperately try to survive the terror that has haunted them for years. This time, Laurie must confront her deepest fears and summon every ounce of strength to finally end the terror of Michael Myers once and for all.
As the matriarch of the Strode family, Jamie Lee Curtis delivers a powerful performance as a woman determined to protect her loved ones, no matter the cost. Judy Greer and Andy Matichak reprise their roles as Laurie's daughter, Karen, and granddaughter, Allyson, respectively, providing compelling and emotional performances that anchor the film.
Nick Castle, together with James Jude Courtney, portrays the silent and relentless embodiment of evil, Michael Myers. Castle, who famously portrayed Myers in the original Halloween in 1978, lends an authentic and nostalgic touch to the antagonist's character while Courtney delivers a physicality that adds to the visceral and terrifying presence of The Shape.
Joining the cast is Anthony Michael Hall, who plays the grown-up version of Tommy Doyle. Hall breathes new life into this familiar character, who was previously portrayed in the original Halloween by actor Brian Andrews. Kyle Richards also reprises her role as Lindsey Wallace, another survivor from the original film, providing valuable connections to the series' roots.
Under David Gordon Green's meticulous direction, Halloween Ends maintains the tension and suspense that fans of the franchise have come to love. The audience is taken on a rollercoaster ride of fear, as the "Final Girl" trope is dissected in unexpected ways, subverting traditional horror film conventions and challenging audience expectations.
The score, composed by John Carpenter, predominantly features the hauntingly iconic Halloween theme. This timeless anthem of fear elevates the suspense and terror of the film's narrative. You can play and download these spine-tingling sounds [link to Halloween Ends official soundtrack].
Halloween Ends takes a thought-provoking look at the trauma inflicted upon the Strode family, exploring themes of generational trauma, survival, and the enduring power of family bonds. As the series conclusion, it provides satisfying closure to longtime fans of the Halloween franchise while leaving no stone unturned in terms of emotional depth and character development.
In this climactic battle between good and evil, Laurie Strode's resilience and determination are put to the ultimate test. As she confronts her personal demons and faces the embodiment of pure evil, Halloween Ends delivers a jaw-dropping, heart-pounding climax that will have audiences on the edge of their seats.
As the menacing Michael Myers stalks his prey one final time, the film packs a series of relentless and gruesome scares that will leave viewers breathless and questioning their own vulnerability long after the credits roll.
In conclusion, Halloween Ends (2022) is a must-see horror film that serves as a captivating conclusion to the Halloween saga. With the talented cast, expert direction, and an electrifying score, audiences will be engrossed in the terrifying world of Michael Myers, experiencing both fear and catharsis as Laurie Strode's long-standing battle reaches its nail-biting end.
As an added treat, you can play and download the haunting sounds of Halloween Ends [link to soundtrack] and immerse yourself in the bone-chilling atmosphere of this thrilling conclusion.
Related soundboards:
Halloween Ends
Prank Call : Dr. Phil
Halloweentown II: Kalabar's Revenge
The Simpsons Season 12
Timbrel SFX Library
Failure SFX Library
Halloween
Halloween
Halloween (1978)
Halloween
Halloween Music
Halloween Scary Stories
Halloween Horror Effects
Halloween Instrumental Music
Halloween songs (limited aditon)
Halloween 2
Halloween Ambient Music
Halloween Jazz Music
Halloween Kids Music
Halloween
Halloween Ringtones
Halloween in the Jungle
Halloween Lesson
Halloween II
Halloween 2
Halloween II (1981)
Halloween III: Season of the Witch